Scope of Work
Situated in downtown Columbus, Hilton 2.0 is one of the largest hotels in Ohio, with a 28-story, 350-foot rise. Connected to the Greater Columbus Convention Center and the existing Hilton, this second hotel signifies the continued growth of Columbus. This 460,000 sq. ft. new build offers over 47,000 sq. ft. of meeting space, several ballrooms, 463 guest rooms, as well as a rooftop panoramic bar overlooking the city.
On a .56 acre with limited laydown area, our work consisted of all electrical installations throughout the hotel. This involved a new AEP service, which included (1) 13.2kV Medium Voltage Switchgear, (2) 13.2kV/480V Utility Transformers, and (1) 1MW Generator. Mid-City’s scope included feeding power to all guest rooms and suites, installation of one full-size kitchen, three partial kitchens, and several ballrooms, including a 15,000 sq. ft. grand ballroom. We installed over 100 different light fixture types for this installation, one of which was over 5,000 pounds and composed of nearly 550 components. Additionally, our electricians installed a fire alarm system that ties between three different buildings (Hilton 1.0, the Convention Center, and Hilton 2.0) and a complex lighting control system integrated with AV, room schedulers, room partition controls, along with integration to Hilton 1.0.
In addition to the extensive electrical installations, Mid-City completed a comprehensive teledata scope throughout the hotel, including the installation of over 500,000 feet of category cabling, telecommunications room buildouts, and a fiber optic backbone with interbuilding connections to the existing Hilton. Our team also supported the integration of several specialized systems, including audiovisual, emergency responder radio communications, and intrusion detection. The emergency responder radio system included a fiber connection to the existing system at the Greater Columbus Convention Center. As an additional scope of work introduced late in the project, Mid-City installed a complete dormakaba room security system throughout the hotel. These installations required coordination with multiple specialty vendors to ensure seamless integration of the hotel's communication, security, and technology infrastructure.
Despite the challenges of working within a limited downtown footprint and coordinating complex electrical and technology systems, Mid-City successfully delivered a comprehensive installation supporting one of Columbus's most prominent hospitality developments. The team's exceptional workmanship was recognized with a 2023 BX Craftsmanship Award, reflecting the skill, attention to detail, and dedication demonstrated throughout the project.